Case Studies
Kangaroo River – Riparian Restoration
Kangaroo Valley community works together for a more resilient natural environment.
Taming the Tiger
To investigate alternative methods of Tiger Pear control including Biological and non-chemical Control methods and to try to limit the spread of Tiger Pear in the Gwydir Shire Area
Eliminating Green Cestrum
Using a coordinated approach to eliminate Green Cestrum along the Horton River and to prevent its further spread downstream
Sitting above Bellingen – Sarah Wheelwright and Peter Guthridge’s upper catchment property
Committed landholders in the upper Bellingen Valley are making a significant change to the property through local energy and commitment energy and commitment.
Building a Group at Frenchmans Creek
Support and increase community engagement to raise the awareness of the value of peri-urban bushland
Vale of Clwydd Creek Project
Saving our creek
Corridor Links and Carbon Sinks
Biodiversity for Carbon and Corridors (B4CC)
Buffering World Heritage Forest reserve
Controlling invasive species and restoring health and resilience to vegetation on private land as a buffer to World Heritage